THOROUGHBRED SYNTHETIC RACETRACK DESIGN AND CONSTRUCTION
April 20, 2020
CAMBRIDGE JOCKEY CLUB, RACECOURSE ROAD, CAMBRIDGE
Cogswell Surveys are proud to provide the design, procurement and construction monitoring services for New Zealand’s first thoroughbred synthetic racetrack.
The Cogswell Surveys team under the guidance of Phil Cogswell (Director) and Rene Nielsen (Senior Civil Engineer) un...
NORFOLK DOWNS EXTENSION
April 21, 2020
TERRY CAME DRIVE, CAMBRIDGE NORTH
Completion of Stages 1 and 2 of this project have been completed and our Planning Team under the guidance of Rebecca Steenstra have obtained consent to Stage 3 for a further 25 residential Lots that will provide the connection through to Isobel Hodgson Drive to the south.
Th...
C3 RESIDENTIAL GROWTH AREA
April 20, 2020
CAMBRIDGE ROAD
The C3 structure plan area of approximately 40 ha is the next large tract of land to be opened up for development and Cogswell Surveys have been working with the clients to develop a structure plan that will provide the framework for future residential growth in this cell on...
BARDOWIE INVESTMENTS LIMITED
April 20, 2020
APL PROJECT SITE LAURENT / SWAYNE ROAD
The construction of one of the largest industrial buildings ever built in NZ is happening within a new block of land immediately north of the Waikato Expressway on the outskirts of Cambridge.
This project will eventually be the base for the glass manufacturing and aluminium ...
LARGE LOT RESIDENTIAL DEVELOPMENT
April 20, 2020
ROTO-O-RANGI ROAD AND LAMB STREET, LEAMINGTON
Stages 1 and 2 of this recent project have been completed providing the first 85 sections within this high class large lot residential development, which will eventually provide approximately 165 new sections of approximately 2500m² in size between Lamb Street and Roto-O-Ra...
SWAYNE ROAD WEST
March 2, 2018
This project is currently in the first stage of construction involving the development of the first 46 Lots of a planned 200 Lot development to be completed in three stages. The project is essentially the last stages of the existing Norfolk Downs development which abuts to t...
WAIKATO EXPRESSWAY - CAMBRIDGE SECTION
March 1, 2018
On completion of the Cambridge Section of the Waikato Expressway, HEB Construction engaged Cogswell Surveys to establish Post Construction Settlement Monitoring Pins.
These pins were established on roads in areas of fill, both the main expressway alignment and local roads, a...
THORNTON PARK - STAGE 3
January 26, 2018
Thornton Park Stage 3 has 10 lots which also includes a cul-de-sac (Brennan Place) and walking access to the reserve which runs parallel to the Waikato Expressway.Cogswell Surveys have been involved with all areas of the Thornton Park Development, including Stage 3, from gai...
ST KILDA CAMBRIDGE
January 26, 2018
This project was recently completed and is the single largest project undertaken by Cogswell Surveys.
This multi award winning project involved the development of 285 large residential sections, with a Commercial area, retirement village ( BUPA ) and several duplex developme...
ROSE LEIGH DRIVE EXTENSION
January 26, 2018
This recent project has seen the first stage of construction completed of 16 Lots and planning for the second and final stage underway. This project consists of a total of 40 residential sections with associated roading and infrastructure including the connection of Rose Lei...
Loading...